Substantial underground workings.*** Entrance is via the air shaft, this can be done via a 10m electron ladder down to the in-situ steel ladder, alternatively it can be done via srt, equipment needed 20m rope, couple of slings and approx 5 carabiners.
External Links
Publications (3)
- (1992); CATMHS - Newsletter 033-December; 35 pages
- (1993); CATMHS - Newsletter 034-April; 56 pages
- Richards, Alun John (1991); Gazeteer of the Welsh Slate Industry, A; Gwasg Carreg Gwalch 978-0863811968